Main plate holder [watchmaking]
The
purpose of this quick report is just that - to provide an update
to those who follow our watchmaking progress. Also, we feel that sharing
our trials and tribulations may one day help someone on their own
watchmaking journey.
Last week we started to prototype the main plate. The
main focus was on positional tolerances and working out the 'perfect'
press fit for the main train jewels. But it wasn't long until we figured
out that we are wasting too much material; precisely over 60%. In
addition, our work holding method was excellent in relation to rigidity,
however, our solution would be very inefficient for mass production -
even a quantity of just a dozen pieces at a time.
We
had two options: To continue with prototyping or to pause and find
a better clamping
solution before we go any further. I voted for the first option: to keep
learning and not to worry about waste. However, I was quickly outvoted
by Josh (who already had Andrew on his side). The final straw was a
video which clearly shows a very effective mainplate holding solution on
Willemin Macodel CNC, as demonstrated at Baselworld in 2015. Here is
the link to it. Definitely worth watching:
In just 3 working
days, putting in a solid 50 hours of work, Josh and Andrew designed,
coded and manufactured our new 'clamp'. The benefits are already paying
off:
- we can use a smaller blank than before, while there is no compromise on rigidity;
- the brass waste is now below 50%
- the new work-holding piece allows for both sides milling plus 90 deg side cut without having to
re-clamp the piece;
-
and, most importantly, the new blanks could be clamped directly
without pre-machining preparation which saves 25 minutes per piece!
Thursday, March 29, 2018
4-Jaw Chuck
Some
hobbyist machinists love it - and others hate it. And, I guess, it is
fair to say that those who hate it have actually never got around to
learning how to centre it properly. Which is rather a shame because
there are countless YouTube videos out there dealing with the subject.
Our
Schaublin 102 is still somewhere south of Suez, but the 4-jaw
chuck arrived separately this week. It was a
'non-catalogue' accessory supplied by Rohm. This was a bit of surprise -
after all, Schaublin is a work-holding specialist themselves. However,
the 4-jaw chucks are a much different beast than collets.
Rohm
is a German family business which specialises in chucks. They've
been making lathe chucks since 1909 and they are regarded as the world's
leading chuck manufacturer. And that's all they do. (Have you noticed
that the O in Rohm is actually a chuck?). This German company is very
proud of the fact that they can manufacture work-holding pieces up to 4
metres in diameter and weighing 25 tons! When it comes to production
capacity: Rohm can assemble 92,000 chucks in 5 days.
There is something mighty powerful about German manufacturing - and we are proud to have a piece of it in our Sydney workshop.
Tuesday, March 27, 2018
Baby steps
The inner bearing surface of the watch jewel is one of the most 'perfect' surfaces on Earth! Made of synthetic ruby, jewels are laser-drilled, then polished with tungsten wire and diamond paste. Both the inner and outer diameter are perfect as well. This one is R=0.500 mm and the inner radius is just 50 microns. However, the modern jewels are still the pale shade of jewels used in the finest 1800's marine chronometers which were made of real diamonds, hand-drilled and hand-polished - and still perfectly functional today!
Last week we started machining our first watch main plate. The challenge: to figure out both jewel hole sizes and the distances/angles between the jewels in the main train. These are watchmaking machining fundamentals - and yet another of the many best kept secrets in the watchmaking industry. While you can tell your mill where to create a hole, and while you know what the outside diameter of the jewel is, finding the 'perfect' friction fit between ruby and brass is something you can only figure out after a number of attempts. No machine or software can tell you how 'just right' feels like; it is the years behind the watchmaker's bench which ultimately determines the outcome.
The bottom line is this: If your shaft is the size of a hair, how much off centre can you afford to be?
After last week's exercise, Josh started making a bold prediction how soon we could potentially have our in-house movement. I am still very cautious and conservative, and reluctant to be drawn into speculation, but there isn't the slightest doubt in my mind that one day we will have a true made in Australia calibre. Exciting days ahead!
Friday, March 23, 2018
What others call fine-gloss finish we call roughing
Yesterday we undertook a practical exercise; the roughing of a piece of 316L steel. Roughing simply means removing the top layer of material rapidly in order to prepare a surface for machining. In other words, think of it as levelling your block before starting the build of a house.
The tool of choice was a 4mm end mill. The machining was done in the Kern Pyramid Nano and it was Andrew and Josh's first job in the workshop.
After the milling operation the surface finish was so smooth and even that it left them speechless. Actually it's so good that the process can be applied straight away to watch bridges and finish.
We can only imagine what kind of surface we will achieve with a diamond or ceramic tool.
Certainly the credit goes to the hydro-static guides of the Pyramid Nano.
Wednesday, March 21, 2018
Well done Maxx Tooling
We
are impressed! On Friday we placed an order for a pneumatic-held vice
and
it arrived on Monday. That would be an impressive delivery time even for Sydney
metro - let alone for a part which flew in from Michigan US.
MAXX
specialises in custom engineered and machined parts and tool holders.
If
you visit their website you won’t find much about the company (it’s almost an
underground operation!). However, they are very serious about quality and precision.
So
what is the benefit of a MAXX solution? We can now machine a part in our 5 axes
Kern mill and then transfer the same part holder to our Makino EDM to continue
with further operations. One part, one holder, two completely different
machines and machining processes - no loss in accuracy.
And
yes, the EDM clamp held in the MAXX vice was made in Brookvale, in our
workshop.
Good job apprentices!
Monday, March 19, 2018
Heat treatment of watchmaking micro-components
Regardless
what kind of metal machining shop you intend to setup and what is your intended
product (a car engine or a watch!) your ultimate goal is to enable yourself to
do certain tasks and processes. Starting with relatively simple ones: To draw
and measure. The ability to hold and grab firmly and accurately is the next
goal. Then to cut, drill and tap, weld and solder. From then on, you are moving
into more serious operations which require sophisticated machinery: turning,
milling, grinding. Obviously your product has to look appealing so you should
invest in deburring and polishing equipment as well. Another sometimes
overlooked aspect of metalworking: The ability to soften or harden metal. And
this is precisely where we are right now.
A
number of steel watch parts (stem,
levers, screws, arbours) undergo both pre-machining
and post-machining heat treatments. A typical furnace has to provide
not only a relatively high temperature (up to 1100 C) but the temperature
has to be constant within a very tight range over a very vast spectrum
from 100 C to 1100 C. In addition, the parts compartment must remain
oxygen-free during the entire process. A quality furnace would also incorporate
an oil quenching tank and shielding with inert gas. Yes, while the basics of
metal heat treatment are rather simple and well-known, watchmaking furnaces are
fairly complex performance-wise.
Taking
into account our low volume and part size we have opted for the smallest
furnace by Borel. (Don't be fooled with its size - it weighs almost
200kg!) Borel is a Swiss manufacturer which supplies equipment to all the top
Swiss watch brands. The company was founded in 1918 by Dr. Charles Borel. As of
last year, Borel is a division of SOLO Group, located in Porrentruy, Jura.
If
you are a watchmaker or machinist specialised in micro components which require
heat treatment then we would be happy to assist - especially if you
have issues with scaling and oxidation.
Contact us at workshop@clockmaker.com.au
Friday, March 16, 2018
An addiction to tools is no different to any other - you just need one more
Last
year we put out a questionnaire trying to figure out why you follow
us? The majority of our subscribers are here for the obvious: A love
of watches. However, there is a growing group of subscribers who are
fascinated with machining, precision and fine tools. And for them, from
time to time, we include a photo or two to illustrate our journey into
the world of 'making'. Disclaimer: since I am not the one who operates
the machines, I don't take credit for anything you'll see
here – all the credit goes to the kids.
Yesterday’s challenge: To make a tool 'fixture'. Fixtures are
work-holding devices designed to hold, locate and support raw material
or parts during manufacturing operations. There is another special
property of the fixture: it provides a means to reference and alignment
for the cutting tool.
In other words: The quality of your part is directly related to the quality of your fixture. Or, as machinists say: if you want to make a precision part, you need a super precision fixture. Which logically brings us to a challenge: If your part is a fixture, then how do you make a fixture to hold your first fixture?
To cut a long story short, two pieces of steel were individually and separately cut, then a number of holes were drilled and taped. Locating and guiding pins were inserted. Then the moment of truth: The pieces were joined together. "Where is the gap?" asked Josh. No-one replied; it was well past 10pm and he was in the workshop by himself. "I am going to engrave Andrew and Josh on this one" was the first thing he told me after arriving home close to midnight. "In that order?" I’ve asked.
In other words: The quality of your part is directly related to the quality of your fixture. Or, as machinists say: if you want to make a precision part, you need a super precision fixture. Which logically brings us to a challenge: If your part is a fixture, then how do you make a fixture to hold your first fixture?
To cut a long story short, two pieces of steel were individually and separately cut, then a number of holes were drilled and taped. Locating and guiding pins were inserted. Then the moment of truth: The pieces were joined together. "Where is the gap?" asked Josh. No-one replied; it was well past 10pm and he was in the workshop by himself. "I am going to engrave Andrew and Josh on this one" was the first thing he told me after arriving home close to midnight. "In that order?" I’ve asked.
But
he didn't hear me. His thoughts were 17,000 kilometres away. "You know,
we need to call MAXX in Michigan. They make a super precision vice, and
we need one for Kern." "Didn't we just
order one from Lang?” I asked. "Yes, but we need one more!"
And that summed it up. Addiction to tools is no different to any other: you just need - one more.
And that summed it up. Addiction to tools is no different to any other: you just need - one more.
Thursday, March 15, 2018
We told him he couldn't leave until he cut the perfect cube
A couple of days ago we locked Andrew up in the workshop. We told him he couldn’t leave until he cut the perfect cube. Material: stainless steel 316L grade, the same stuff the Swiss watch cases are made of. Luckily, Andrew didn’t bother asking us to clarify what perfection meant to us. To ask a watchmaker’s apprentice to cut the perfect cube on a Makino U32J is like giving the keys of your brand new Ferrari to a teenager and asking him to find out how fast it can go.
Oh, yes, the first few attempts were rather disappointing but he just kept pushing that pedal harder. On the second day he finally got his parameters right ("I was so excited I almost hugged Josh!") .
So what is perfection? The short answer is: We really don’t know. Once again, we have reached sub-micron levels where actual dimensions of a metal cube are no longer stable; where metal expands and shrinks purely due to the change in room temperature; where the measuring machine itself influences the piece measured; and where human error in acquisition of parameters is greater than the machine’s ability to measure the part.
Once again on a 10mm-side cube, to his shock and horror, Andrew has reached sub-micron precision. In Brookvale!
So what’s next? We are now ready to go to the next level: integration of CAD and CAM software so we can finally start prototyping the most intriguing, irregular shapes. Like, for example, levers and springs pictured below. By the way, these springs come from a junk box of American pocket watches from around 1890-1920. They do look scary - like an arsenal of inquisition/torturing tools! For us, they are highly motivational - if Americans could make such delicate high precision watch parts back then using 19th century machinery, surely we should be able to at least do the same today.
Friday, March 9, 2018
Tuesday, March 6, 2018
Who do you respect?
***Three reasons why you should invest in an Australian watch TODAY
1. We Respect You
We
respect your expectations. There is nothing more annoying and useless
than a broken watch! When you invest in a watch designed and assembled
in Australia, you are investing in a robust, reliable and repairable
watch. Rebelde is not 'just as good as any other Swiss-made watch'.
It is a timepiece designed and
hand-assembled by a third generation Master watchmaker. There is no such
thing as a broken rebelde: every single one of the 600 watches
assembled in the past 4 years is keeping time and performing as
promised.
2. We Respect You
We
know you don't see a watch merely as a sum of finely-machined micro
components. Your watch is an expression of who you are and what you
stand for. And if there ever were a brand with a story to be told - a
watch you can wear with pride - then it is your Australian rebelde. We
don’t have customers - we only have comrades and
ambassadors.
3. We Respect You
Wearing
a mechanical watch is an act of rebellion and sophistication! In a
fast-paced world where lives are governed by heartless and soulless
gadgets, mass-produced by robots, your decision to remain stubbornly
old-fashioned and to govern your life by a slow-ticking, mechanical
watch means just one thing: RESPECT! Your investment in an Australian
watch is a smart investment in the future of Australia. Thanks to
project 'rebelde' we now have 3 watchmaker apprentices and one student
of mechanical engineering who are committed to spend the rest of
their lives designing and making watches in Australia. And if we can add
just one more supporter every week, then by this time next year we
could invite one more Australian apprentice to join our team. We grow
when you respect us back.
To place your order select from one of three stainless steel models listed at https://nicholashacko.com.au/watches
$500 deposit. Delivery time: 3 weeks.
Friday, March 2, 2018
Just another painful blister
After 10 days of
assembly the Kern Pyramid Nano was finally alive! On Wednesday night all
systems were as per specs, fluids were running cheerfully, and the spindle and
5 axis motion left us speechless. It was the time for final laser
calibration; the moment of truth. With the coolness of a pilot of a fighter
jet, Michael 'the German dude' set his Renishaw apparatus and commenced the
four hour adjustments procedure.
Now if you are not an
engineer then the next sentence and picture below will make absolutely no sense
to you, and that is perfectly fine - so no hard feelings. The total
error over the 400mm table was well under 1 micron and not more than 0.1
micron per 100mm of table travel. "So the machine is well within what
could be described as a miracle of mechanical engineering?"
we've asked. "Actually I am not sure" said cool Michael.
"What we see is not the 'machine error' itself but the error in nano-range
is most likely just the effects of environmental temperature and vibration of
the building." And finally, it all sunk in. This is precisely
why Kern calls Nano - nano. Too tired to celebrate, we quietly went
home, each of us dreaming our own nano dreams...
Around
lunch time on Thursday, I got a phone call from Josh: "Bad news,
dad. The x-axis has just disappeared of the screen. It looks like we
have a problem with the linear decoder. We are now disassembling the
entire block, Michael has cancelled his return flight and is extending
his stay for at least another week. Yes, we need a new encoder, new
cabling and Kern is sending a spare CPU unit from Germany, just in case
we need it too." The four hour sub micron calibration vanished with the X-axis without a single part being machined.
The
other day, Elon Musk's Space-X launched Zuma, the top secret US
spy satellite. But moments after the launch, like our x-axis, the
multi-million dollar satellite disappeared - literally vanished off the
radar. Yes, engineering on any scale can be heartbreaking and
engineering is not for the fainthearted.
In
January 2012, Pat Farmer accomplished one of the greatest feats in
human history. He arrived at the South Pole after the longest and
arguably most dangerous run ever. Pat ran for 21,000 kilometres - never
complaining about being tired nor disappointed, or his painfully
bloody blisters, cramps and injuries. He just ran - and that
determination - that physical and
mental triumph - put him in the company of the world's greatest
adventurers and achievers.
And
this is precisely what our "Made in Australia" project is all
about: endurance, not giving up, being tough as nails, and being
prepared to pay the price. And we'll enjoy every bit of that journey,
even when it hurts.
Thursday, March 1, 2018
Workshop training exercises well past midnight
When
asked by aspiring engineers and entrepreneurs for a 'fast track tip'
Elon Musk said: instead of 40 hours per week, do 80 hours. All things
being equal you will achieve your yearly goal by June. To get there even
sooner, do 100 hours.
It’s
funny how time flies when you learn new stuff. Last night we stayed in
the workshop well past midnight. The first training exercise: a 5 x 5 mm
block with 1 mm gap. We got within 2 microns on the first go. The
second exercise: toothed cylinder, 8 mm in diameter, watch gear profile.
Then another cut: its reverse 'image'. Material
316L.
Made in Australia? You bet.
What we have learned:
If you can imagine it, you can draw it. If you can draw it, you can make it.
What we have learned:
If you can imagine it, you can draw it. If you can draw it, you can make it.
Tuesday, February 27, 2018
From the world's smallest watch brand: Makino up and running!
Yes,
we are happy. The 50 micron wire cutter has been successfully
installed. Exclusively for our rebelde comrades: here is the picture
of a first test cut. For comparison, the top surface is a standard
milling finish , the cube itself is cut by EDM. The finish can be best
described like one on the edge of a razor blade. Scary!
The
cutting time for this tiny cube: two hours. Machining cost: Just
over $120. It goes without saying that only the space, medical and watch
industries can afford such costs. Exciting times ahead!

Another week @ rebelde workshop
This
week Michael (the German technician who came to install our Kern mill),
Josh and Andrew went through hell. After four 12-hour-shift days,
the installation hit a wall with great force: the laser adjustment tool
required for 'final alignment' is still on its way to Sydney. Obviously,
this delay will cost us time and money but we are still conservatively
optimistic that by the end of next week Kern will be up and running. The
preliminary test runs are all good: the hydraulics, cooling system and
electrical/electronic commands and the main
spindle 3-hour tests are all OK.
The
complexity of the system is mind-blowing and we have learnt that no
part of the machinery can be regarded as 'auxiliary'. Each component
and each parameter is absolutely critical. For example: the oil in the
hydraulic system which is responsible for the movement of the main table
has to be chilled to an exact temperature of 21.0 C. For that to
happen, the Kern is fitted with not one but two “refrigerators”: one
which produces a cooling liquid chilled at 11.3C and the other which
'outputs' 17C. The final temperature is then finely tuned within the
3-tonne iron cast base which itself acts as a large capacitor.
Such
a fine tuning can be only achieved when one cooler is located as close
to the machine as possible, while the other is located as far away as
you can place it. The Australian summer is not helping either, with
temperatures soaring to 40C inside the factory unit. The amount of heat
generated is close to unbearable and in addition, we are drawing so
much current. Right now, the entire system is pushed to the absolute
limit which means just one thing: Further reconfiguration, more
insulation, better pipelines and a further upgrade to the electrical
wiring.
One
thing that needs to be recognised, and given credit for, is
that these guys below are just Aussie kids setting up one of the world's
most precise machines. These are the future makers of your watch so
don't forget these faces.
Thursday, February 8, 2018
Josh Reporting: One crazy hashtag
"Just finished 8 days of training in
Germany, at the precision machine tool builder, Kern Microtechnik! The
red machine behind me in the photo below is the most accurate machine
tool in the world, holding a scattered position tolerance of 0.3
microns, which is a 3000th of a human hair! In fact, the research and
development team at Kern have actually drilled HOLES through human hair
with Pyramide Nano - the very same mill to be used in Brookvale
#makinginternalcomponentsforthefirstandonlyAustralianmadewatch. Next
stop
Switzerland!"
Invisible Forces In Horology
This is a cool little video showing magnetised watch pallets. Magnetism in horology is extremely annoying. The magnetism is causing erratic performance which is hard to pinpoint. Luckily, it's easy to rectify by running the pallets through a demagnetiser. The escape wheel pallets and hairspring are are three crucial components in watch escapement and all three being made out of steel are highly susceptible to magnetism.
Subscribe to:
Posts (Atom)